Kwinana Lithium Refinery: What IGO’s Write down Means for Australia’s Battery Supply Chain

Originally published 1 July 2026 · Updated 21 November 2026

Quick answer. There are two separate lithium hydroxide refineries at Kwinana in Western Australia. The older one, run by Tianqi Lithium Energy Australia (TLEA), is owned 51% by Tianqi and 49% by IGO and has a 24,000 tonne a year nameplate. IGO fully impaired its share of the refinery assets in FY25 after years of production well below nameplate. The newer one, operated by Covalent Lithium, is owned 50:50 by Wesfarmers and SQM, has a nameplate of about 50,000 tonnes a year and reached first product in July 2025. The IGO write-down relates to the first refinery, not the second.

The Kwinana lithium refinery was supposed to prove Australia could do more than dig up spodumene and ship it to China. Instead, it has become the most expensive lesson in the country’s downstream ambitions. IGO has fully impaired the Kwinana refinery assets held through its 49% stake in the joint venture with Tianqi Lithium, recording A$605 million as its share of the impairment in a year in which it reported a group net loss after tax of A$955 million. The refinery is running well below its 24,000 tonne nameplate capacity, with what IGO describes as an unsustainable cost structure, and with its future still being worked through by the joint venture partners.

This is not just an IGO problem. If Kwinana fails under full Chinese ownership, it raises serious questions about whether Australia can build a domestic battery materials industry at all.

Why the Kwinana Lithium Refinery Has Never Worked as Planned

Tianqi broke ground on Kwinana in 2016. Train 1 produced its first lithium hydroxide chemical in August 2021 and its first battery-grade product in May 2022. Since then, the plant has never sustained production anywhere near nameplate capacity.

In the first half of FY25, Kwinana produced just 3,095 tonnes of lithium hydroxide against an annualised capacity of 24,000 tonnes. That is roughly 26% utilisation. Conversion costs sat at A$27,136 per tonne, while the facility posted an EBITDA loss of A$161 million for the half. Works on the second train ceased in January 2025.

Update, 21 November 2026. IGO’s FY26 results (ASX release, 27 August 2026) show Kwinana produced 8,839 tonnes of lithium hydroxide in FY26, up from 6,782 tonnes in FY25 but below the 9,000 to 11,000 tonne guidance. That is about 37% of the 24,000 tonne nameplate (our calculation). Conversion cost was A$18,379 per tonne, and fourth-quarter output was 897 tonnes because of a planned shutdown. IGO’s share of TLEA swung to a A$207.3 million profit in FY26, from a A$642.0 million loss in FY25, which IGO attributes to stronger spodumene pricing, better Greenbushes earnings and the absence of the FY25 impairment, not to a refinery turnaround.

The problems are technical, not just cyclical. Equipment failures, slow ramp-up, and high operating costs have plagued the site since commissioning. Lithium hydroxide prices have fallen more than 60% since late 2022, but even at higher prices, Kwinana’s cost base would struggle to compete with integrated Chinese processors.

IGO Is Walking Away. Tianqi Is Staying. What Happens Next

IGO has been explicit: it does not see a path to sustainable returns at Kwinana. The company is in active discussions with Tianqi about the future of its 49% stake. A full exit is on the table.

Tianqi, by contrast, has confirmed it intends to retain control and is not shutting the refinery down. The Chinese company operates four lithium production bases in China and is building a 30,000 tonne battery-grade hydroxide facility at Zhangjiagang. Kwinana, despite its issues, gives Tianqi a processing foothold in the world’s largest hard-rock lithium jurisdiction.

The divergence in outlook is telling. IGO, as an Australian-listed company answerable to shareholders, cannot justify continued capital allocation to a loss-making downstream asset. Tianqi, backed by the strategic logic of securing feedstock processing outside China, can afford a longer time horizon.

This is the kind of analysis we publish daily in The Drill Down. Subscribe HERE for free.

Australia Has the Ore and the Policy Tailwinds. It Does Not Have the Operating Expertise.

Australia produces roughly half the world’s lithium. It has bipartisan political support for onshore processing, A$7 billion in legislated critical minerals production tax credits, and every geological advantage a downstream industry could want.

What it does not have is operational experience running chemical plants at scale. Kwinana is not an isolated case. Albemarle’s Kemerton hydroxide facility in Western Australia has faced delays and cost overruns. Covalent Lithium’s Kwinana refinery, owned by Wesfarmers and SQM, has also had a slow ramp-up, which Wesfarmers’ FY26 results attribute to intermittent odour issues. The pattern suggests systemic challenges in establishing lithium chemical processing in Australia, not just bad luck at one site.

Building a refinery is a capital allocation decision. Running one efficiently is an operational capability. China has spent two decades building integrated lithium supply chains with established expertise, lower labour costs, and economies of scale that Australian operators cannot yet match.

If Kwinana Fails Under Chinese Ownership, What Does That Signal to Investors

The uncomfortable scenario is this: IGO exits, Tianqi takes full control, and Kwinana either limps along as a strategically motivated loss-maker or eventually shuts down. Either outcome undermines the investment case for Australian downstream processing.

For junior lithium companies pitching downstream integration, Kwinana is a cautionary tale. The gap between a feasibility study and a profitable operating plant is enormous. Investors who have backed the “mine-to-battery” thesis in Australia should be watching this closely.

The broader policy question is whether production tax credits and favourable regulation are sufficient to overcome a genuine skills and scale deficit. Government incentives can close a cost gap. They cannot create operating expertise that does not exist.


Two Refineries, One Suburb

Tianqi Lithium Energy Australia (TLEA)Covalent Lithium
OwnersTianqi Lithium 51%, IGO 49%Wesfarmers 50%, SQM 50%
Nameplate capacity24,000 tonnes a year (Train 1 only; works on Train 2 ceased January 2025)About 50,000 tonnes a year
First lithium hydroxideChemical in August 2021; first battery-grade product in May 2022First product in July 2025 (announced 15 August 2025)
Spodumene sourceGreenbushesMt Holland, owned by the same joint venture
Recent performanceFY26 output of 8,839 tonnes, below the 9,000 to 11,000 tonne guidanceRamp-up under way; Wesfarmers’ FY26 results cite intermittent odour issues
Financial positionIGO’s share of the full impairment of the refinery assets: A$605 million in FY25Wesfarmers lithium earnings before tax of A$40 million in FY26, against a A$59 million loss in FY25, driven by spodumene; refinery ramp-up costs capitalised until commercial production

Sources: IGO ASX announcements (20 May 2022, 24 January 2025, 28 August 2025, 27 August 2026), S&P Global (23 August 2021), and Wesfarmers’ 2026 full-year results (27 August 2026).

Key Takeaways

  • IGO fully impaired its share of the Kwinana lithium refinery assets (A$605 million) in FY25, a year in which it reported a group net loss after tax of A$955 million. The company sees no path to sustainable returns.
  • Kwinana’s problems are structural, not just cyclical. Multiple Australian lithium hydroxide projects have faced similar ramp-up failures, suggesting a systemic capability gap in downstream processing.
  • If Tianqi assumes full control, Australia’s flagship onshore lithium refinery will be entirely Chinese-owned, complicating the narrative around sovereign battery supply chains.

FAQ

What is happening with the Kwinana lithium refinery?

IGO has fully impaired its 49% stake in the Kwinana lithium hydroxide refinery and is in discussions with joint venture partner Tianqi Lithium about exiting the project. IGO reported a group net loss after tax of A$955 million in FY25, including the A$605 million impairment, and the refinery has never operated near its 24,000 tonne annual nameplate capacity. Works on the second processing train ceased in January 2025. Tianqi has indicated it intends to retain its 51% stake and continue operations.

Why is the Kwinana lithium refinery losing money?

The refinery faces a combination of technical ramp-up failures, high conversion costs, and a collapse in lithium hydroxide prices exceeding 60% since late 2022. In the first half of FY25, Kwinana produced just 3,095 tonnes at a conversion cost of A$27,136 per tonne, well above competitive benchmarks set by integrated Chinese processors. Equipment failures and production disruptions have prevented the plant from reaching economies of scale.

Who owns the Kwinana lithium refinery?

The Kwinana refinery is owned by Tianqi Lithium Energy Australia (TLEA), a joint venture between China’s Tianqi Lithium (51%) and Australia’s IGO Ltd (49%). IGO is currently seeking to exit its stake after fully impairing the investment. If IGO exits, Tianqi would assume full ownership of the Kwinana (TLEA) refinery, one of Australia’s lithium hydroxide plants.

What does the Kwinana writedown mean for Australia’s battery supply chain?

The write down signals that Australia’s push to move beyond raw lithium extraction into downstream chemical processing faces serious commercial and operational barriers. Multiple Australian hydroxide projects, including Albemarle’s Kemerton and the Wesfarmers-SQM Covalent Lithium refinery at Kwinana, have encountered similar difficulties. Government incentives such as critical minerals production tax credits may narrow the cost gap but cannot substitute for the operating expertise and scale that Chinese processors have built over two decades.

Are there two lithium refineries at Kwinana?

Yes. The TLEA refinery (Tianqi 51%, IGO 49%) and Covalent Lithium’s refinery (Wesfarmers 50%, SQM 50%) are separate facilities with different owners, capacities and histories. The IGO write-down relates only to the TLEA refinery.

When did Kwinana first produce battery-grade lithium hydroxide?

The TLEA refinery produced its first lithium hydroxide chemical in August 2021 and announced first battery-grade product on 20 May 2022. Covalent Lithium’s refinery achieved first product in July 2025.

Who owns the Kwinana lithium refinery?

That depends on which plant. TLEA is 51% Tianqi Lithium and 49% IGO. Covalent Lithium is 50% Wesfarmers and 50% SQM.


Sources

IGO ASX announcements: first battery grade lithium hydroxide, 20 May 2022; Kwinana update, 24 January 2025; FY25 results, 28 August 2025; FY26 results, 27 August 2026. Wesfarmers, 2026 full-year results, 27 August 2026. S&P Global, first lithium hydroxide chemical at Kwinana, 23 August 2021. Original sources: Mining.com February 20, 2025 and January 20, 2025; Argus Media August 28, 2025; Mining Weekly August 28, 2025; Batteries International February 6, 2025; Discovery Alert August 2025.